project description
Client: Landeschulrat für OÖ
Architekect: Jörg Stögmüller
Functions:
The old stock was gutted and the rooms rearranged; the new stock and the gymnasiums were renovated. In this context, the building services and fire protection were brought up to the latest standards and barrier-free access was created. A further gymnasium was built on stilts, so that it provides a roof for the outdoor gymnastics area. In addition, a connecting bridge made of steel and glass was built to the neighbouring BG/BRG Anton-Bruckner-Straße, which enables direct access for the students, so that the new gymnasium can be used by both schools.