project description
Client: Gemeinde Elsbethen
Architect: Marius Project ZT GmbH, Salzburg
Functions:
Recycling yard with office, warehouse and hazardous waste collection point, 7 saw-tooth container bays with height adjustment and 6 additional container storage areas, green waste trough and small container storage areas.
Special features:
Pellet heating system in combination with a solar system and photovoltaic system on the roof, EIB electrical installation, prepared for a barrier access system.
Challenges overcome:
Rock formations, brook to be built over and ÖBB high-voltage power line