project description

Conversion of a former tankhall of the Armed Forces into a multi-functional building.

Project type: production
Location: A 5020 Salzburg

Client: Panzerhalle Errichtungsgesellschaft m.b.H
Architect: ARGE Panzerhalle hobby a. I LP architektur I cs-architektur I Strobl Architekten

Functions:
Medical centre, market hall, loft offices, loft apartments, exhibition areas, associated underground car park

Challenges overcome:
Revitalisation of the existing "Panzerhalle" in the former Struber barracks in Salzburg, partly during ongoing operations.

Construction method:
Reinforced concrete skeleton construction, visible load-bearing structure, exposed brickwork, underpinning of the existing wall structures with high-pressure floor mortar.

you want to realize a project and need information? what can we do for you?

send us an e-mail:
office@pm1.at
senden sie uns eine e-mail an
office@pm1.at
or call us directly at
+43 662 871 667
oder rufen sie uns gleich direkt an unter
+43 662 871 667