project description
Client: BIG Bundesimmobiliengesellschaft mbH
Functions:
Offices, laboratories for chemistry, biochemistry, hygiene and microbiology, Audimax for approx. 500 students
Challenges overcome:
Existing buildings, complex construction site logistics, cramped inner-city space, complex excavation securing, static strengthening of the existing load-bearing structure, complex temporary underpinning of the load-bearing structure, high degree of installation.