project description

New construction of the "paracelsusbad" swimming pool and health resort in Salzburg with photovoltaic installation.

Project type: leisure, sport, recreation
Location: 5020 Salzburg

Developer: Stadt Salzburg Immobilien GmbH
Architect: BERGER + PARKKINEN ARCHITEKTEN, WIEN

Functions: 
public swimming pool with waterslide, outtdoor pool on the roof and restaurant, sauna, health resort

Overcome challenges: 
Explosive ordnance sounding in high-risk areas, excavation pit securing with sheet pile walls and shotcrete nail walls, underpinning work in existing buildings, basement floor as brown tub in pressurised water (groundwater), joint firewall with Hotel Sheraton incl. Connection of the two underground garages, excavation work on the bastion wall in coordination with the Salzburg Federal Monument Office and restoration of the bastion incl. viewing window in the new building, pool technology for the spa building (therapy pool, moor treatment, moor and spa baths, gymnastics hall etc.).) and public swimming pools, swimming pools on several floors incl. Jump tower/jump pool and water slide, outdoor pool and sauna world on the top floor, elaborate ceramic lamella facade with high required assembly accuracy, suspended wave-shaped ceramic lamella ceiling with integrated lighting on the bathing level, holori ceilings in the swimming pool area, post-and-beam construction with metal cassettes and glazing, all-round glazing on the bathing level, photovoltaic systems on the roof, self-service catering area on the 4th floor and separate sauna/restaurant area incl. associated kitchen.

you want to realize a project and need information? what can we do for you?

send us an e-mail:
office@pm1.at
senden sie uns eine e-mail an
office@pm1.at
or call us directly at
+43 662 871 667
oder rufen sie uns gleich direkt an unter
+43 662 871 667