project description
Client: Tiergarten Bauprojekt GmbH
Architect: Ried+Zrenner architektur
Functions:
A residential complex is being built with three individual buildings - consisting of a total of 121 residential units and a connected underground parking garage.
For local recreation, the outdoor area will be designed with green spaces and a children's playground. To increase energy efficiency requirements, a photovoltaic system will be installed on the roof.
Challenges overcome:
Building in the flight path of the airport; Building in groundwater.
PM1 Baumanagement is responsible for the local construction supervision and the preparation of the specifications.